 |
Implemented
a citywide mosquito abatement program
|
 |
Expansion
and 3-laning of Canal Boulevard/LA Hwy 20
|
 |
Extension
of the 40 Arpent Road -
Glenwild Extension (West
By-Pass)
|
 |
Construction
of left turn lane at LA Hwy 308 and Canal Boulevard
|
 |
SP
Road (between Jackson & St. Mary St.) resurfacing
|
 |
Upgraded
roadways with street maintenance program
|
 |
Established
Road Improvement Street Priority System
|
 |
Northbound
drive up lane at Post Office
|
 |
East
Corridor connecting Back Street to Canal Blvd.
|
 |
Left
turn arrow on 5th Street at Canal Blvd.
|
 |
Rosedown
right turn lane
|
 |
Presentations
to Joint Legislative Committee on highways for
city priorities
|
 |
Completed
west side natural gas line improvement project
|
 |
Commenced
south side natural gas line improvement project
|
 |
West
side water line improvement project
|
 |
Relocation
and construction of new Audubon sewer station
|
 |
Provide
city water line to Acadia Woods to provide fire protection
|
 |
Applied
and approved for federal funding of approximately $1.5
million for major drainage improvement projects citywide
|
 |
Renovated
Public Works building to accommodate
“one-stop
shopping” for public needs
|
 |
Annually
cleaned, tested, painted and marked all city fire
hydrants
to maintain high rating thus reducing insurance rates
|
 |
Installation
of watering/irrigation system on Canal Boulevard
|
 |
Rewired
street lights on Canal Blvd. and upgraded wiring on
lights
throughout city
|
 |
City-wide
excavation project for all open ditches
|
 |
Obtained
state-of-the-art closed circuit television system for use
in
sewer and drainage lines
|
 |
Demolition
and condemnation of dilapidated housing throughout
the
city
|
 |
Removal
of dangerous or diseased trees on city property
|
 |
Erected
new beacon for airport
|
 |
Installed
runway lights at airport and electrified new beacon and wind sock
|
 |
Secured
radio for Thibodaux airport to allow operator to communicate directly
with air traffic.
|